Grind / Mix / Pave Project

This project consists of grinding, mixing, and compacting approximately 4300 square yards of existing asphalt with the underlying roadway base material and then placing a 4-inch thick layer of hot mix asphalt on ‘F’ St. (Lincoln St. to Hayes St.) and on Adams St. (3rd St. to ‘A’ St.). This project also consists of milling a 2-inch section of asphalt that is approximately 850 square yards on Line St. (SH-8 to ‘A’ St.), placing pavement overlay geotextile, and then paving 2-inch layer of new hot mix asphalt.

Line St. will be closed during the day while work is performed, but open during evenings and weekends. Adams St. and 'F' Street will also be closed during the day while work is performed, but will remain closed to everyone except local traffic during evenings and weekends. Citizens are asked to be aware of detours set up around these locations.​

Timeline

All work has been completed and the streets have been opened to traffic!​

Thank you for your patience during construction. These repairs will help to keep our streets in good condition for everyone to use.​​​​​


​​Contact Us

Tyler Palmer -
Streets/Fleet Manager​
tpalmer@ci.moscow.id.us
208.883.7097​​
​​

​​​​​​​Accessibility Assistance

If you need ADA accessible​ assistance or feel this or any other City of Moscow project is impacting your ability to access public services, please contact the City of Moscow at:
ejaccessibility@ci.moscow.id.us
208.883.7600​

​​