2018 construction projects


  • Third Street Reconstruction – Polk to Hayes, Phase II
    Included in this project will be reconstruction of Third Street from Monroe Street to Polk Street.  Reconstruction will include pavement replacement with under-drains and replacement of waterline, storm sewer infrastructure and sanitary sewer.  Pedestrian curb ramps at intersections will also be replaced to comply with ADA requirements.  The timeline for this project is mid June to September.
    Click for Project Update

  • Third Street & Jackson Sidewalk Replacement
    This project consists of removing and replacing concrete sidewalk, curb, tree wells and lighting.  Concrete pavers will be installed together with new historical style luminaries along the north and west frontage of 129 W. Third Street. The approximate timeline for this project is September to October.
    Click for Project Update

  • Third Street Corridor Multimodal Improvements
    This project consists of implementing a dual east/west bike lane on the north side of Third Street beginning at Third and Jackson Street heading east to Mountain View Road. There will be additional bulb outs added for pedestrian safety and three raised cross-walks for speed regulation, as well as median dividers.  The timeline for this project is late summer to early fall.
    Click for Project Update

  • Third Street Bridge
    This project consists of installing a new forty-four (44’) foot bridge over Paradise Creek along Third Street west of Mountain View Road. The timeline for this project is summer to early winter.
    Click for Project Update

  • 5339 Grant Shelters – 2018
    The project will incorporate the installation of six pre-manufactured shelters (bus & bike).  Construction will include trash receptacles, bicycle racks and repair station and a bench. The timeline for this project is from July to September
    Click for Project Update

    Paradise Path Underpass & Multimodal Extension
    This project consists of the extension of Paradise Path from Styner Ave / Highway 8 to the Latah County Fairgrounds. A new ten (10') foot wide shared-use path will be constructed along the north side of White Ave along with an underpass at Highway 8 connecting the new pathway extension to the existing Paradise Path. The timeline for this project is late June to late September.
    Click for Project Update

    Slurry Seal – 2018
    The project consists of applying an Asphalt Slurry Seal Coat (Type II) to multiple roads within the City of Moscow.  Slurry Seal is a thin layer of fine rock mixed with asphalt that is applied to the road sealing the surface.  This application reduces surface wear and extends longevity of the road. Maps showing the areas of impact will be published once finalized.  The current timeline for this project is mid to late June through mid July.
    THIS PROJECT IS NOW COMPLETE.


    White Avenue Water Main Replacement – 2018
    This project will include construction of new water main, new storm water infrastructure and reconstruction of the westbound lane road base along White Avenue from Blaine Street to Highway 8.  The project timeline is mid-May to late June.
    THIS PROJECT IS NOW COMPLETE.  


    Contact Us
    City of Moscow Engineering Division
    221 E. Second Street
    Moscow, ID 83843
    208-883-7034
    scollins@ci.moscow.id.us 


    _________________________________________________________________________________________________
    Idaho Transportation Department Concrete Grinding Project - 2018
    Idaho Transportation Department (ITD) will be carrying out a Concrete Grinding Project on Jackson Street (US 95) between W. C Street and Eighth Street, in Moscow, beginning on June 25th and continuing through mid-August.

    ITD’s contractor for this project is Acme Concrete Paving, Inc., of Spokane.  Acme will use a concrete pavement rehabilitation technique to grind and repair concrete slabs on Jackson Street and reseal the joints.

    UPDATE FROM ITD - PROJECT COMPLETE 8/20/18