City of Moscow Logo


PRESS RELEASE

Third Street Bicycle/Pedestrian Bridge Installation 

May 15, 2019 (Moscow, Idaho) —  Installation of the Third Street Bicycle/Pedestrian Bridge is scheduled to take place on Thursday, May 16, 2019. 


The bridge will be set using a crane, which requires street closures at Third Street and 
S. Roosevelt Street and Third Street and S. Mountain View Road, beginning at 7:00 a.m., until approximately 1:00 p.m. 

There will be no vehicular access during the installation window and it may be necessary for residents to park vehicles outside the closure area if trips are planned during this time. If you need ADA accessible assistance, please call 208-883-7600.

It is anticipated the bridge setting should take approximately 2 hours and once complete, the street will be reopened for residential access.  

Because your safety is of utmost priority, the City is requesting residents and onlookers either stay indoors during the installation or observe from the designated public observation area ONLY, which will be located near the Third Street and S. Roosevelt Street intersection.

Maps of the street closure and observation area can be viewed at: https://www.ci.moscow.id.us/DocumentCenter/View/17804/Third-St-Ped-Bridge-maps 

We apologize for any inconvenience this closure may cause and thank you for your continued patience.  

For questions, please call Public Works Engineering Division 208-883-7034.                                   
###

Story Contact: Tyler Palmer, Acting Public Works Director
Phone: 208-883-7096
Email: tpalmer@ci.moscow.id.us 


City of Moscow

206 E Third Street
Moscow, ID 83843
Contact: Gary J. Riedner, City Supervisor
Phone - 208.883.7006
Email - griedner@ci.moscow.id.us
Website - www.ci.moscow.id.us

Map of work zone to set pedestrian bridge
Powered by CivicSend - A product of CivicPlus